FDP Pro Series S-Curve Tallback Chairs 18" Seat Height, 4-Piece (15129-XX)

FDP Pro Series S-Curve Tallback Chairs 18" Seat Height, 4-Piece (15129-XX)

Skip to product information
1 of 7
Variant missing image
Regular price $2,482.85
Sale price $2,482.85 Regular price
Black/Gray
Navy/Gray
Navy
Sky Blue Crosshatch
Slate Gray Crosshatch
Crimson
Black/Crimson
Black
Gray
Teal
SKU: FDP-15129-BKGY

Lead Time: 2 - 4 Weeks

View full details
View More Details →

Similar Items

View All

Certifications

certified
Green Guard

This product complies with strict chemical emissions limits and meets the indoor air quality pollutant standards for sensitive environments such as indoor schools or offices.

certified
BIFMA

This item meets high quality ANSI/BIFMA standards for comfort, safety, sustainability, and durability in furniture.

certified
CertiPUR-US Certified

CertiPUR-US certification indicates that flexible polyurethane foam used in products like mattresses and furniture has been tested to meet specific standards for content, emissions, and durability.

Product Details

Elevate the sophistication and functionality of any professional space-including hotel lobbies, busy waiting rooms, and corporate office environments-with the FDP Pro Series S-Curve Tallback Chair 4-pack. This stylish set is meticulously crafted with smooth leatherette vinyl, offering a luxurious yet durable finish that seamlessly complements a wide range of interior designs. Designed to eliminate the complexity of modular seating, this 4-pack features an intuitive design that allows the chairs to easily slide together, instantly forming a collaborative, semi-circle arrangement. This configuration is specifically engineered to foster a sense of community, naturally encouraging productive team projects, relaxed casual conversations, and open collaboration among occupants. Each hand-finished, commercial-grade Tallback Chair is built upon a sturdy wood frame, guaranteeing exceptional quality, safety, and durability, as they meet and exceed rigorous industry testing standards.

The FDP Pro Series Tallback Chairs offer unparalleled convenience, arriving ready to use right out of the box, requiring only a simple push to join them into the desired semi-circle gathering spot. With a comfortable seat height of 18 inches from the floor, these chairs are available in a variety of color choices to perfectly match your decor. For added versatility, each chair includes pre-installed, adjustable glides to protect flooring and ensure stability; interchangeable casters and legs are available separately for customization. Proudly made in North America, this 4-pack represents a premium, long-lasting investment designed to enhance the appeal and utility of any high-traffic professional area.

Product Features

  • High-Quality Material: Crafted with commercial-grade leatherette vinyl, offering a smooth, durable, and sophisticated finish.
  • Industry Safety Certified: Meets or exceeds BIFMA industry standards for durability and safety assurance.
  • Health-Conscious Components: Made with CertiPUR-US certified foam, ensuring the cushioning is made without harmful chemicals.
  • Fire Safety Compliant: Fully complies with flammability regulations for enhanced safety in commercial spaces.
  • Low Emissions Certified: GREENGUARD Gold certified for low chemical emissions, contributing to healthier indoor air quality.
  • Ready-to-Use: Arrives with no assembly required, simply unpack and place the chairs.
  • North American Made: Proudly manufactured in North America, supporting high quality and production standards.
  • Professional Versatility: Ideal for a wide range of professional environments, from luxury hotels and waiting areas to board rooms and office lobbies.
  • Synergetic Arrangement: The 4-pack is designed to easily push together to form a semi-circle, facilitating collaboration and conversation.
  • Flexible Seating: Chairs can also be pulled apart to function as standalone, individual S-Curve Seats for flexible space planning.
  • Robust Weight Capacity: Each individual chair is engineered to safely support up to 300 lbs.
  • Ergonomic Comfort: Features a smart, structured Tallback and comfortable seating for an "office oasis" feel.
  • Sturdy Construction: Built on a robust, engineered wood frame for superior stability and long-lasting performance.
  • Premium Finish: Each piece of seating features a smooth, hand-finished aesthetic.
  • Effortless Maintenance: The leatherette material is designed for uncomplicated upkeep, easily enduring daily wipe downs with mild soap and water.

Product Specs

Details

assembly Assembly Required leg option Glides
material Foam, Polyurethane, Wood warranty 2-Year Manufacturer Limited Warranty
weight 148 lbs weight capacity 300 lbs
country of manufacture Mexico model # FDP-15129-XX
pack includes 4-piece Seating Set

Dimensions

overall dimensions 104"L x 25.5"W x 36.75"H overall height 36.75 in
overall length 104 in overall width 25.5 in
seat height 20 in