FDP Pro Series Tallback S Curve Chairs 12" Seat Height, 4-Piece Set (15125-XX)

FDP Pro Series Tallback S Curve Chairs 12" Seat Height, 4-Piece Set (15125-XX)

Skip to product information
1 of 5
Variant missing image
Regular price $1,870.85
Sale price $1,870.85 Regular price
Black
Black/Gray
Gray
Navy
Navy/Gray
SKU: FDP-15125-BK

Lead Time: 2 - 4 Weeks

View full details
View More Details →

Similar Items

View All

Certifications

certified
Green Guard

This product complies with strict chemical emissions limits and meets the indoor air quality pollutant standards for sensitive environments such as indoor schools or offices.

certified
BIFMA

This item meets high quality ANSI/BIFMA standards for comfort, safety, sustainability, and durability in furniture.

Product Details

The FDP Pro Series 4-Piece Tallback Chair Set offers an instant, designer-quality refresh for modern, kid-friendly communal spaces, distinguished by its unique and striking tallback shape. This set is engineered for flexibility and style straight out of the box, allowing you to instantly transform any gathering area. Whether you need to create a cozy, intimate grouping or integrate the chairs into a larger seating arrangement, the units can be effortlessly pushed together or pulled apart, giving you the freedom to revitalize and customize your space's layout over and over again. With a comfortable and accessible seat height of 12 inches from the floor, and a variety of vibrant colors to choose from, this North American-made chair set combines aesthetic appeal with practical versatility for dynamic environments.

Beyond its immediate visual impact and modular design, the FDP Pro Series provides options for long-term customization to perfectly match the evolving needs of your space. While the core chairs deliver a robust seating solution, you have the option to further adapt the set's functionality by purchasing interchangeable casters or standard legs separately. This allows you to easily switch between stationary seating and mobile units, ensuring that this versatile set can grow and change with your requirements, maintaining its value and designer touch as a cornerstone of your modern, flexible communal space.

Product Features

  • Versatile Layout Options: Specifically designed to enhance modern child-forward hospitality spaces such as libraries, lounges, pediatric waiting rooms, and lobbies.
  • High Traffic Suitability: Specifically qualified to be used in high-traffic communal environments, offering superior durability and resilience.
  • ANSI/BIFMA Certified: Meets the demanding safety and performance standards set by the American National Standards Institute (ANSI) and the Business and Institutional Furniture Manufacturers Association (BIFMA).
  • CertiPUR Certified: Utilizes foam that meets the standards of the CertiPUR program for content, emissions, and durability.
  • GREENGUARD Gold Certified: Proven to meet some of the world's most rigorous third-party chemical emissions standards, contributing to healthier indoor air quality.
  • North American Manufacturing: Proudly Made in North America, ensuring adherence to high quality and labor standards.
  • Optional Customization: Accepts separately sold interchangeable casters or legs for future adaptation and customization of mobility and height.
  • Collaborative Configuration: The 4-Piece Set can be effortlessly pushed together to form a unified, collaborative seating configuration.
  • Individual Arrangements: The units can be easily pulled apart to create flexible, individualized seating arrangements as needed.
  • Kid-Appropriate Sizing: The seating areas are scaled perfectly for children, ensuring kids feel like an important and comfortable part of any gathering space.
  • Robust Engineered Wood Frame: Each Tallback Chair is built with a durable, robust engineered wood frame for long-lasting structural integrity.
  • Smooth Hand Finished Vinyl: The seating surface is upholstered in a smooth, hand-finished vinyl, offering a comfortable feel and designer aesthetic.
  • Easy-to-Clean Surface: The vinyl material is suitable for high-traffic communal spaces and withstands daily wipe downs using a mild soap-and-water solution.
  • Pre-installed Adjustable Glides: Each chair comes with pre-installed adjustable glides to stabilize the unit on uneven floors and protect the floor surface.
  • Designer Tallback Shape: Features a unique, high-back design that contributes a distinctive designer touch and visual interest to the space.

Product Specs

Details

assembly No Assembly Required leg option Glides
material Foam, Polyurethane, Wood warranty 2-Year Manufacturer Limited Warranty
weight 109 lbs country of manufacture Mexico
model # FDP-15125-XX pack includes 4-Piece Set
shape S Curve 

Dimensions

overall dimensions 108"L x 36"W x 24.75"H overall height 24.75 in
overall length 108 in overall width 36 in
seat height 12 in