FDP Pro Series Upholstered S Curve Ottoman 12" Height, 3-Piece (15099-XX)

FDP Pro Series Upholstered S Curve Ottoman 12" Height, 3-Piece (15099-XX)

Skip to product information
1 of 7
Variant missing image
Regular price $762.85
Sale price $762.85 Regular price
Black
Gray
Navy
SKU: FDP-15099-BK

Lead Time: 2 - 4 Weeks

View full details
View More Details →

Similar Items

View All

Certifications

certified
Green Guard

This product complies with strict chemical emissions limits and meets the indoor air quality pollutant standards for sensitive environments such as indoor schools or offices.

certified
BIFMA

This item meets high quality ANSI/BIFMA standards for comfort, safety, sustainability, and durability in furniture.

Product Details

Elevate your professional space with the FDP Pro Series S-Curve Ottomans, a line of stylish, multifunctional seating designed to enhance a variety of settings including hotel lobbies, waiting areas, and modern office environments. Crafted with smooth leatherette vinyl for a sophisticated look, these ottomans are available as single pieces for a chic touch or in multiples to unlock versatile arrangement capabilities, effectively fostering community and encouraging collaboration among users. Beyond offering a premium seating solution, these pieces are highly functional, serving perfectly as comfortable footrests or handy side tables for supporting office essentials like notebooks and beverages.

These commercial-grade ottomans are built to last, featuring a sturdy wood frame and a meticulous, hand-finished quality that ensures they meet and exceed industry testing standards for both safety and durability. They arrive ready to use right out of the box, complete with pre-installed, adjustable glides, meaning no assembly is needed. With a comfortable seat height of 12 inches from the floor, and available in a variety of colors to match your décor, the design is highly customizable; interchangeable casters and legs are sold separately should you wish to further personalize your space. Proudly made in North America, these S-Curve Ottomans are the ideal solution for sophisticated, flexible office furnishing.

Product Features

  • High-Quality, Commercial-Grade Construction: Specifically designed for use in demanding professional environments such as libraries, lounges, hotel lobbies, waiting areas, and professional offices.
  • Pre-Installed Adjustable Glides: Arrives ready to use right out of the box with adjustable glides pre-installed for easy setup and level placement.
  • BIFMA Industry Standards Compliance: Meets or exceeds BIFMA (Business and Institutional Furniture Manufacturers Association) standards for durability and safety.
  • GREENGUARD Gold Certified: Complies with rigorous environmental standards, including GREENGUARD Gold, ensuring low chemical emissions for healthier indoor air quality.
  • CertiPUR-US Foam: Made with CertiPUR-US certified foam, meeting standards for content, emissions, and durability.
  • Flammability Regulation Compliant: Complies with mandatory flammability regulations, ensuring an added layer of safety.
  • Customizable & North American Made: Available in a variety of colors, features a seat height of 12 inches, and offers optional interchangeable casters and legs (sold separately) for customization. It is Made in North America.
  • S-Curve Design: Features a stylish, modern "S-Curve" shape, offering a unique and aesthetically pleasing seating element.
  • Smooth Leatherette Vinyl Upholstery: The seating surface is crafted from a smooth, leatherette vinyl, providing a sophisticated look and a soft yet durable texture.
  • Durable and Easy to Maintain Upholstery: The leatherette is designed for uncomplicated upkeep, easily withstanding daily wipe-downs with a mild soap-and-water solution.
  • Robust, Engineered Wood Frame: Built with a sturdy, engineered wood frame to ensure long-term durability and stability in commercial settings.
  • Hand-Finished Seating Surface: Each ottoman features a smoothly hand-finished seating surface, indicating attention to detail and quality craftsmanship.
  • Synergetic Seating (Kid-Friendly Sizing): The size is ideal for children, putting "fun in functional" and making younger users feel like an important part of any gathering space.
  • Flexible Configuration (3-Piece Set Option): Available in single units or a 3-Piece Set that can be pushed together to form a collaborative configuration or pulled apart for individual seating arrangements.
  • Multifunctional Use: Serves not only as chic seating but also as perfect footrests or handy side tables for office essentials.

Product Specs

Details

assembly No Assembly Required leg option Glides
material Foam, Polyurethane, Wood warranty 2-Year Manufacturer Limited Warranty
weight 60 lbs country of manufacture Mexico
model # FDP-15099-XX pack includes 3-Piece
shape S Curve

Dimensions

overall dimensions 40"L x 20"W x 12"H overall height 12 in
overall length 40 in overall width 20 in